-
- This can depend on the area where the project is and the PAL levels. Best Practice recommendations are:
- Minimum of 150 gallons of water on site, with pump and hose.
- Round Point Shovel
- Pulaski
- 5 Gallon backpack pump
- Fully charged Fire Extinguisher
- Dedicated Fire Patrol personnel
- This can depend on the area where the project is and the PAL levels. Best Practice recommendations are: